Hey all I know it’s been a little while since I posted about the house. It was going like crazy, now it seems things are slowing a bit well at least it doesn’t look like much anyway. All the plumbing, electrical, (and we had a lot of extra lighting added) structure wiring and insulation are all in. It looks really good. We almost had a little mishap with some wiring. I really wanted to add some of my own wiring and decided I would. Well the builder wasn’t to pleased about that but after a little discussion and I think he could see I know what I’m doing he let the wiring stay. Wow I was glad about that. Now we are waiting on an inspection and then drywall should show up tomorrow or Monday. After that it will take about 3 days to put up all the drywall and about a week to tape mud and sand it. After that we should receive a closing date about 45-50 days out.

Fire place and insulation.

Comm closet! Only a tech guy would convert his hall closet to a comm closet. This will house all the networking, whole home audio, phones, intercom, dvr security cameras, blue ray and hd dvr for both the family room and master bedroom TV’s.

Master Bedroom door to back.
Posted by me!!